GENERAL
DESCRIPTION
ChemProof's heavy duty vertical products are supplied in 25 and 125 square foot units. These coverages are based on a standard
1/8 inch
thickness.
Applied at 1/8 inches these
materials will withstand the most severe mechanical and chemical abuses.
All of the PERMATEC V systems
are applied in the same manner, only the "A" to "B"
(Resin to Hardener) weights and ratios are different. For a complete
ratio listing refer to the "Weights and Ratios" bulletin.
PACKAGING
AND COVERAGE
Each kit size is made up of the following components:
Part A - Resin
Part B - Hardener
Part C - Mix Silica
Filler Part A - Filler Resin
Filler Part B - Filler Hardener
| Sq.
Ft. Kit |
Component |
Package |
|
|
25 |
A |
1 - 1
gal. bucket |
|
|
|
B |
1 - 1 qt.
can or 1/2 gal. jug |
|
|
|
C |
22 lbs -
loose |
|
|
|
Filler Part A |
1 - 710
CC |
|
|
|
Filler Part B |
1 - 8 oz.
can |
|
|
125 |
A |
1 - 5 gal
pail |
|
|
|
B |
1 - 2 1/2
gal jug |
|
|
|
C |
2 - 100
lb. bags |
|
|
|
Filler
Part A |
1 - 1 gal
bucket |
|
|
|
Filler
Part B |
1 - 1/2
gal jug |
|
| Note:
Only 110 lbs. of silica is required for a 125 sq. ft. kit. |
|
SURFACE
PREPARATION
New Concrete - The concrete should be well cured for a minimum of 10
(ten) days, per ACI 308-81, (R-1986), clean, dust free and free of all
contaminants. Mechanical methods such as sandblasting or grinding should be employed to remove the weak layer of surface
laitance. These are the most practical methods for the preparation of
vertical surfaces. A minimum tensile strength of 200 psi is required of the
prepared surface. Acid etching with muriatic acid is acceptable but less
desirable. Care must be taken to completely remove all residual acid
prior to the application of any vertical product.
Existing Concrete - Concrete must be
structurally sound and free of all contaminants. Weak or contaminated
concrete must be removed until sound concrete is realized. Old coatings,
toppings, waxes, oils, etc. must be removed prior to the application.
MIXER
REQUIREMENTS
For 25 sq. ft. units, a 5-gallon bucket mixer having a side and bottom
scraping action has been found most suitable.
125 sq. ft. units should be
broken down into 25 sq. ft. units and mixed the same way.
MIXING
Prior to application, the PERMATEC V material (Resin, Hardener, and
Silica) and the substrate should be a minimum of 65 degrees F.
Do not begin mixing until
material is ready for use.
-
Pour Part "A"
(Resin) and Part "B" (Hardener) into the mixer and mix for
approximately 1 1/2 minutes.
-
Add Part "C"
(Silica) slowly to the "A" - "B" mix. Continue
mixing only long enough to wet evenly and disperse the Part
"C" (1 to 3 minutes), and stop the mixer.
-
Immediately remove the
mixed material and distribute it onto trowel boards. The prompt placement
of the material on the trowel boards will help disperse the heat and
will insure adequate time for the application.
APPLICATION
Note: Whenever possible, avoid applying PERMATEC V in intense heat and
direct sunlight. This will reduce the possibility of blistering due to
outgassing concrete.
-
First, use the
"Vertical Filler" to fill bug holes and seal the concrete
surface.
-
After the Vertical
Filler has tacked over (usually about 2 hours) you can mix and
trowel the PERMATEC V material to 1/8 inches.
-
Before the PERMATEC V
material sets up, backrolling the surface with a nap roller and a
small amount of xylene or similar solvent, will aid in the
elimination of trowel marks.
CLEAN
UP
All mixing and application equipment should be cleaned immediately after
use. If this is done, soap and water, or biodegradable cleaners can be
used. If the material has begun to set, more aggressive solvents may be
necessary. Before using solvents, refer to their respective MSDS for
handling considerations.
STORAGE
AND SHELF LIFE
The heavy duty toppings should be stored at 50-90 degrees F and out of
sunlight. Containers should remain unopened until ready for use. If
stored as set out above, a minimum shelf life of 1 year can be realized.
WHERE
PERMATEC V PRODUCTS SHOULD NOT BE INSTALLED
PERMATEC V products should not be applied over substrates:
-
subject to hydrostatic
pressure
-
unsound structures
-
contaminated substrates
which cannot be cleaned
-
at temperatures below 65
degrees F (Consult ChemProof Polymers).
SAFETY
PERMATEC V flooring systems contain blended Epoxies as the resin and
blended Amines as the hardener. Protective clothing and gloves are
recommended to prevent sensitization to these materials. In case of
ingestion or eye contact, contact a physician immediately. MSDS are
available for this product upon request.